At DAL Lunapark Makinaları A.Ş. we don't only manufacture amusement rides. We also provide the engineering, design, planning and consultancy a new amusement park may need from the idea stage to opening day.

We develop project-specific solutions by assessing the investment's target audience, the characteristics of the site, visitor capacity, budget and operating needs together.

How a project runs

  1. 01Needs and site assessment
  2. 02Product selection and layout plan
  3. 03Production, delivery and installation
  4. 04Testing, opening and operating support
  1. 01

    Engineering consultancy

    Technical assessment and engineering consultancy for existing or planned amusement rides. Depending on the project's needs we support customers with:

    Scope

    • Product selection
    • Definition of technical requirements
    • Capacity planning
    • Mechanical system assessment
    • Safety requirements
    • Technical suitability of the installation site
    • Electrical and infrastructure needs
    • Local regulations and certification requirements
  2. 02

    Project and technical drawing services

    We prepare the technical drawings and project work needed for amusement rides and park projects.

    Scope

    • Concept drawings
    • General layout plans
    • Product layout drawings
    • Mechanical project drawings
    • Production drawings
    • Assembly drawings
    • Foundation and anchor plans
    • Electrical and infrastructure requirement plans
    • 3D modelling
    • Technical file preparation
  3. 03

    Park design and layout planning

    Concept, layout and technical planning services that make the most efficient use of the site for new amusement parks. We build suitable product groups and layout alternatives around the park's target visitors, total area, visitor capacity and investment budget. Topics assessed in planning:

    The layout plan lets visitor flow, operational efficiency and product capacity be assessed together at the investment stage.

    Scope

    • The park's overall concept
    • Target age groups
    • Product selection and distribution
    • The balance of thrill, family and children's rides
    • Visitor circulation routes
    • Entry and exit points
    • Queue and waiting areas
    • Operations and staff areas
    • Emergency exits and evacuation routes
    • Technical service and maintenance access
    • Electrical and infrastructure requirements
    • Future growth and space for new products
  4. 04

    Investment consultancy

    Before a new amusement park or entertainment centre investment, we help define the project's basic needs. Topics assessed:

    Scope

    • Usable area
    • Target visitor profile
    • Estimated visitor capacity
    • Product and attraction distribution
    • Production and delivery schedule
    • Infrastructure requirements
    • Staffing needs
    • Maintenance and technical service needs
    • Phased investment and growth options
  5. 05

    Product selection and capacity planning

    Every park's site, target audience and visitor density are different. Rather than simply presenting a catalogue, we help determine the right product combination for the project. Product selection weighs:

    Scope

    • Target age group
    • Usable area
    • Passenger capacity
    • Hourly throughput
    • Waiting times
    • Variety of motion and experience across products
    • Maintenance and operating needs
    • Budget
    • Future growth plan
  6. 06

    New-park set-up consultancy

    Setting up a new amusement park means managing different disciplines at the same time and in the right order. DAL Lunapark provides technical and operational consultancy from the investment decision to opening day. Consultancy scope:

    Scope

    • Definition of project needs
    • Technical assessment of the site
    • Product selection
    • Preparation of the layout plan
    • Definition of infrastructure needs
    • Production and delivery schedule
    • Transport and site organisation
    • Coordination of the installation process
    • Testing and commissioning
    • Pre-opening technical checks
    • Operator training
    • Preparation of maintenance plans
    • Technical support in the first operating period
  7. 07

    Certification and compliance consultancy

    Technical regulations and approval processes for amusement rides can vary from country to country. The certification and compliance process for the machine to be built is planned around the country of installation, the customer's requirements, the relevant regulations and the technical characteristics of the project. Where required, the following are carried out in coordination with the customer:

    Scope

    • Technical file preparation
    • Submission of engineering calculations
    • Preparation of production documents
    • Issuing of test reports
    • Coordination with independent inspection bodies
    • Product- and country-specific certification procedures
  8. 08

    Renewal of existing parks

    Assessment and renewal solutions that adapt existing amusement parks and entertainment areas to changing visitor expectations and operating needs.

    Scope

    • Technical assessment of existing products
    • Re-planning of site use
    • Relocation of products
    • New product proposals
    • Mechanical modernisation
    • Electrical and automation renewal
    • Visual renewal and re-theming
    • Capacity development
    • Maintenance and spare-part planning

Talk to us about your project

Send us the site, target audience and capacity you have in mind. We'll come back with a first assessment and the next steps.